What you're preparing for
FHA 203(k) Consultant professional competency
203(k) Consultants perform the initial inspection, prepare the Work Write-Up and Specification of Repairs, and conduct draw inspections. This academy walks the full 4000.1 consultant workflow end-to-end.
- Program structure, Standard vs Limited 203(k)
- Consultant roles, ethics, and separation of duties
- Initial property inspection and photo protocol
- Minimum Property Requirements and Standards
- Work Write-Up / Specification of Repairs
- Cost estimating, draws, change orders, closeout
DolaOS internal training only. Nothing on this page constitutes a claim of state licensure, HUD roster placement, or regulatory approval.
Learning path
10 modules · Completion: DolaOS HUD Consultant Completion Certificate- 01FHA 203(k) Program FundamentalsReady for Review
- 02Consultant Roles, Ethics, and Separation of DutiesReady for Review
- 03Initial Property InspectionRegulatory Review Required
- 04Minimum Property Requirements and StandardsRegulatory Review Required
- 05Work Write-Up and Specification of RepairsRegulatory Review Required
- 06Cost Estimating and Price Book UsageRegulatory Review Required
- 07Draw Inspections and DocumentationDraft
- 08Change Orders and Contingency ManagementDraft
- 09Final Inspection and Project CloseoutDraft
- 10Case SimulationsDraft
Core tools & checklists
Practice exam preview
203(k) workflow scenario practice
Scenario-based practice covering initial inspection, WWU authorship, draw inspection sequencing, and closeout documentation.
Field scenario
Case study — kitchen scope with unforeseen electrical rework
During the initial inspection the borrower requests a kitchen refresh, but you find an ungrounded branch circuit and a distribution panel with double-tapped breakers. Walk the WWU line items, the MPS/MPR triggers, the cost estimate structure, and the contingency handling.
Sample walkthrough · PreviewForms & reference library
- • Initial inspection room-by-room worksheet
- • Four-corner photo protocol log
- • WWU / SOR draft template
- • Draw inspection report shell
- • Final closeout / lien-release checklist
- • HUD Handbook 4000.1 (consultant sections, overview)
- • MPR / MPS quick reference
- • Sample cost book categories
DolaOS Completion Certificate
On completion of every module and the timed practice exam, DolaOS issues an internal completion certificate: DolaOS HUD Consultant Completion Certificate.